Building a reliability strategy for industrial air and gas handling equipment

Preventive maintenance strategies help industrial facilities improve air and gas handling equipment reliability and reduce the risk of unplanned downtime.

Key Highlights

  • Evaluate equipment against current process requirements and operating conditions before assuming mechanical failure.
  • Investigate the entire system when airflow, vacuum, pressure, vibration or temperature changes.
  • Prioritize maintenance based on equipment criticality, production impact, system redundancy and replacement lead times.
  • Plan spare parts, service support and repair-versus-replacement decisions before equipment failure forces an urgent response.

Whether creating a vacuum for drying and distillation processes, supplying air for wastewater aeration and other process-air applications, or moving and removing air and gases to maintain pressure, air and gas handling equipment supports critical processes in industrial facilities.

Declining performance or equipment failure can have a systemwide impact on production. Maintenance and operations teams that wait until performance changes or warning signs appear may miss opportunities to identify and address root causes before they lead to equipment failure or unplanned downtime.

Long-term reliability depends on understanding what the equipment is designed to do and what normal operating performance looks like. That baseline helps teams recognize meaningful changes in performance.

Effective long-term maintenance combines monitoring, evaluation of the wider system, equipment criticality and planning so teams can respond before problems become failures.

Evaluate equipment against process requirements

No piece of equipment operates in isolation. Maintenance and operations teams should evaluate equipment performance based on the role each asset serves and the operating conditions for which it was selected. A performance issue may stem from changed process or operating conditions.

A liquid ring vacuum pump’s performance depends on vacuum level, seal water flow, seal water temperature, process gas inlet temperature and motor load. If seal water flow is low or the water is too hot, performance can decline even when the pump is mechanically sound. A blower can also appear to underperform if airflow demand or system resistance has changed from the conditions it was originally selected to handle.

Before assuming equipment failure, maintenance and operations teams should evaluate whether process requirements have changed and whether the equipment remains suited to current operating conditions.

Understanding this context helps teams interpret performance changes accurately and avoid misdiagnosis and unnecessary repairs.

Diagnose performance changes across the system

Changes in airflow, vacuum, pressure, vibration, temperature or energy use can signal a problem, but they do not automatically reveal the cause. The cause may originate within the equipment, elsewhere in the system or from changed process or operating conditions.

Increased vibration can point to bearing wear or alignment problems, but it can also result from imbalance, mounting issues or changing operating conditions. A drop in vacuum may indicate a problem with the pump, but it can also stem from a plugged inlet screen, an open valve in the vacuum line or insufficient seal water flow. Because the cause may lie elsewhere in the system, maintenance teams should evaluate the wider system before choosing corrective action.

Misdiagnosis can lead to unnecessary repairs, wasted labor and repeated downtime if the actual cause remains unresolved. Accurate diagnosis helps teams direct labor, parts and repair efforts toward the appropriate corrective action.

Prioritize maintenance based on equipment criticality

The maintenance response for malfunctioning or underperforming equipment should reflect the consequences of failure.

For example, failure of an induced-draft fan on an industrial boiler can require a boiler shutdown because the fan moves combustion gases and maintains proper draft. By contrast, a wastewater aeration system may include a standby blower that can take over when the primary unit is unavailable, allowing the process to continue while the failed equipment is repaired.

When determining the criticality of an asset and its systemwide impact, consider these factors:

  • whether failure stops production
  • whether backup equipment is available
  • how long repairs or replacement would take
  • whether parts are difficult to obtain
  • whether failure affects safety, product quality or downstream equipment

Built-in redundancy can reduce the immediate operational impact of a single failure and influence maintenance priorities. Critical assets without backup may justify more frequent monitoring, faster response when problems arise and an inventory of spare parts.

Equipment criticality can change over time. A backup unit may be taken out of service, production demand may increase, replacement lead times may grow, or a process change may make one piece of equipment more important than it was before. Maintenance teams should review priorities when operating conditions or system redundancy change.

The goal is not to add unnecessary tasks but to focus resources where failure would have the greatest consequence. A criticality-based approach helps teams prioritize maintenance and reduce the risk of an emergency response.

Plan spare parts and service support in advance

Knowing how an asset can fail is only part of the picture. Parts availability and planning are also key to an effective preventive maintenance strategy. Waiting until a failure occurs to identify parts and service options can extend downtime, especially when replacements have long lead times.

Lead times for new parts can vary. Some components are readily available, while others cost more, take longer to obtain or require specialized installation or service. A critical blower that requires a model-specific impeller or shaft can create greater operational risk than equipment that uses readily available replacement parts.

Spare parts planning helps determine which components are worth stocking in advance and which can reasonably be sourced when needed. A spare parts decision can consider factors such as:

  • how critical the equipment is
  • how often the part requires replacement
  • how long the part takes to obtain
  • how expensive it is to keep in inventory
  • whether an alternative or backup is available

A maintenance team’s repair capabilities are also part of the parts and service plan. Teams should know in advance which repairs they can handle internally and which require outside support.

Planning gives teams options and time to adapt when conditions change. Parts and service planning is part of a broader reliability strategy, not simply a purchasing function.

Know when to repair, rebuild or replace equipment

If equipment experiences recurring failures, declining performance or increasing maintenance needs despite routine maintenance, it may be time to consider a broader life cycle decision. Some equipment can be restored to reliable operation with a repair or rebuild, while other assets may be better candidates for replacement. A useful framework for determining an appropriate response is:

  • Repair when the issue is isolated and the equipment still fits the process.
  • Rebuild when several components are worn but the core equipment is still appropriate for the application.
  • Replace when the equipment no longer fits current process needs, parts or support are becoming difficult to obtain, or recurring failures make continued maintenance impractical.

No single factor determines the answer. Older equipment is not automatically a replacement candidate if it remains reliable, supported and suited to the process. Likewise, newer equipment can still become a poor fit if production demands or operating conditions have changed significantly.

Maintenance teams should consider factors such as:

  • equipment age
  • reliability history
  • energy use
  • planned shutdown opportunities
  • cost of continued maintenance

The goal is to make these decisions before an urgent failure limits both time and available options.

Build long-term reliability through proactive maintenance

A reliability strategy for air and gas handling equipment relies on more than simply responding to individual equipment failures.

That strategy starts with understanding the role of each asset within the larger system, which helps teams recognize meaningful performance changes more quickly.

When warning signs appear, maintenance teams should evaluate them in the context of the entire system and process rather than assume an individual piece of equipment is the sole source of the problem.

A well-formed maintenance plan also considers asset criticality, parts availability and replacement lead times, life cycle expectations and repair support. Teams should adapt the plan to each asset rather than apply a fixed approach.

The goal is to give maintenance teams the information and preparation needed to prioritize resources, reduce unplanned downtime, and make informed decisions before changing conditions or equipment failures limit their options.

About the Author

Patrick Dorn

Patrick Dorn

Patrick Dorn is a chemical engineer and sales representative with Mills-Winfield Engineering Sales, Inc. He has extensive experience helping industrial manufacturers evaluate process equipment and application requirements. His background includes technical sales and engineering support across a range of process equipment used in industrial facilities. Dorn works with customers to evaluate equipment performance, operating conditions, maintenance needs and long-term equipment decisions.

Sign up for our eNewsletters
Get the latest news and updates